Dock Leveler
-
Product Features
- It is installed to cover various truckloads at the height of the fixed door.
- Lip adjustment can minimize deviation between loading boxes and tables.
- The leveler is placed on the back of the truck, making the forklift access easier when loading container cargo.
- In addition, it can be manufactured by determining the specifications and specifications of the product according to the height of the concrete deck from the ground, the forklift and the type of carrier.
Specifications
1) Product Specifications
You can Check by Scrolling Left / Right.
CODE | X mm |
Y mm |
H+/- mm |
WEIGHT kg |
---|---|---|---|---|
NEW 150A-ALL | 1,650 | 1,500 + LIP 370 | 240 | 200 |
NEW 200A-ALL | 1,650 | 2,000 + LIP 370 | 300 | 250 |
NEW 250A-ALL | 1,650 | 2,500 + LIP 370 | 360 | 330 |
NEW 300A-ALL | 1.650 | 3,000 + LIP 370 | 430 | 400 |
NEW 150B-ALL | 2,000 | 1,500 + LIP 370 |
240 | 250 |
NEW 200B-ALL | 2,000 | 2,000 + LIP 370 | 300 | 330 |
NEW 250B-ALL | 2,000 | 2,500 + LIP 370 | 360 | 430 |
NEW 300B-ALL | 2,200 | 3,000 + LIP 370 | 430 | 470 |
NEW 150C-ALL | 2,200 | 1,500 + LIP 370 | 240 | 280 |
NEW 200C-ALL | 2,200 | 2,000 + LIP 370 | 300 | 360 |
NEW 250C-ALL | 2,200 | 2,500 + LIP 370 | 360 | 460 |
NEW 300C-ALL | 2,200 | 3,000 + LIP 370 | 430 | 500 |
2) Product Specifications & Features
You can Check by Scrolling Left / Right.
Specification | Dock Leveller |
---|---|
Capacity | 12.0 TON (DYNAMIC: 6.0 TON, STATIC: 12.0 TON) |
PLATFORM | 6/8MM STEEL TREAD PLATE + STRUCTURE MOLD STEEL LOWER REINFORCED FRAME STRUCTURE (REAR CURVED FINISH) |
LIP | 14/16MM STEEL TREAD PLATE + Anti-slip Treatment |
POWER PACK | ITALY Imported Finished Product HYDRAPP MOTOR & PUMP, 0.75KW, 380, 60Hz |
HYD, SYSTEM | DUAL LIFTING CYLINDER + SINGLE LIP CYLINDER |
How to Operate | Power operation by PUSH BUTTON SWITCH |
Scope of Operation | Height adjustable for DOCK LEVELER up to 450MM and 350MM |
Surface Finish | EPOXY PRIMER + PU PAINT TOP COAT FINISH |
Safety Device | 3MM THICK TELESCOPI TOE GUARD AND SERVICE LEG SAFETY DEVICE |
Reservoir Inspection Area | Attach the 300MM*300MM MAINTENANCE INSPECTION COVER to the PLATFORM rear center (POWER PACK) position to enable quick and safe adjustment and flow check of POWER PACK |
Primary Lead-in Electricity | 3-phase 380V 1.5KW with 4TJSTLR 5W ground |